Cardiology Floor Hospital at St. Francis Hospital, Columbus, GA
St. Francis Hospital
•
2020
Carlisle Services was hired by St. Francis Hospital in Columbus, GA for the Interior Renovation of their Cardiology Floor. The scope of work for this project consisted of: Wall Demo and Relocation; Installation of new Casework; Installation of new Lab Sinks; Interior Painting; New Flooring; Acoustical Ceiling.
Data Center Relocation at St. Francis Hospital, Columbus, GA
Life Point Health
•
2020
Carlisle Services was hired by Lifepoint Health for the Data Center Relocation at St. Francis Hospital, Columbus, GA. The scope of work for this project consisted of: Demo of existing Sprinkler System, HVAC and Electrical; Modifying Sprinkler System for new layout; New 6” Concrete Curb and 4” Concrete Slab (Slab was core tested); Rerouting new Condenser Refrigerant Lines; Bore and Sleeving of piping through Walls (all penetrations were sealed); Installing New 4070 Door and Frame; Installing New LIEBERT HVAC Unit; Retrofitting Electrical systems for new layout; New Landscaping.
Fort Gordon – 11th & 13th Floor Ceiling Replacement
Fort Gordon – Dept. of Public Works
•
2020
Work performed at the Dwight D. Eisenhower Medical Center in Ft. Gordon, GA consists of: Removal and replacement of all Acoustical ceiling throughout corridors and rooms of hospital; replacement of all Over-Head Speakers both in the Acoustical ceiling & hard ceiling. In keeping with Infectious Control guidelines for hospital work, all work is done within a negative air containment area assembled and moved by Carlisle Construction.
Nuclear Medicine Equipment Replacement - St. Francis Hospital
St. Francis Hospital
•
2020
Carlisle Construction was hired by St. Francis Hospital in Columbus, GA for the replacement of the existing equipment in their Nuclear Medicine Unit. The Scope of Work included: Demolition of the ceiling, floors, anchor bolts, existing mechanical and electrical; Install new HVAC Package including Plumbing and Mechanical GAS; Install New Trane DOAS-1 & Trane Tracer BAS Control Systems for standalone operation of HVAC System; Retrofit Existing Fire Suppression system; Install New Electrical Package; New Manington Bio-Spec Sheet Heat-Treated Welded Flooring w/ Flashed Coverings; Drywall Patch back; New Drywall Ceiling; Painting of all interior walls.
St. Francis Hospital - Cysto Operation Room
St. Francis Hospital
•
2020
Carlisle Construction was hired by St. Francis Hospital in Columbus, GA for the Interior Renovation of their Cysto Operation Room. The Scope of Work included: Demolition of the ceiling, floors, anchor bolts, existing mechanical and electrical; New Mechanical Package; Retrofitting Existing Sprinkler Heads to match new layout; New Electrical/ Lighting Package; Drywall Patch back (Lead Lined gypsum board); Wall infill from removed 3070 door; Framing for Surgical Lighting installed into ceiling; New Gypsum Board Ceiling; Paint all walls & Ceiling; Install New Heat treated Welded Flooring System with Flashed Coving.